Wire restructuring – New Forensic Psychiatry – Sct. Hans

Client: Region Hovedstadens Psykiatri
Type of Contract: Main contract
Contract sum: DDK 3,3 mio.
Construction period: 2017
Engineer: Niras A/S

Info

Overview

The project is the next development part of The New Forensic Psychiatry – Sct. Hans, where existing supply lines are being restructured.

Furthermore, The New Forensic Psychiatry will be applied with a number of supply points: drainage, water supply, fiber lane, distant heating and strong current.

Key figures

● 520 m waste-water pipe
● 500 m storm water pipe
● 11 pcs. well
● 315 m water pipe
● 320 m guide tube
● 150 m district heating main
● 12 pcs. cancellation of wells

Tilbage til references