Transport line, Hundested-Melby

Client: Halsnæs Forsyning A/S
Type of Contract: Main contract
Contract sum: DDK 24,2 mio.
Construction period: 2017-2018
Main contractor: Orbicon A/S

Info

Overview

Barslund has projected a 12,6 km long transport line between Hundested Renseanlæg and Melby Renseanlæg.

The work consisted of a 11,9 km pressure line with two parallel wires, as well as establishment of three pumping stations. The transport line runs throughout field, forest and roads. Barslund has also carried out a cross-under by the railroad.

Key figures

● 2.000 m² subbase work
● 4.000 m² base gravel work
● 5.500 ton filling gravel
● 7.500 ton disposal of soil fill
● 11.900 m² parallel Ø250 PE wires
● 0,7 m gravitation wire bt
● 2 pcs. diameter 1250 bt
● 36 m diameter 1000 bt basin wire