Transmission lines – Odder Heating Plant

Client: Odder Varmeværk
Type of Contract: Main contract
Contract sum: 10 mio. DKK
Construction period: 2018
Engineer: Niras A/S

Info

Overview

Establishment of transmission lines in Odder

The project included the delivery and establishment of transmission lines in a 3.5 km route between two existing heating plants in Odder city. On most of the section, the existing transmission line was replaced, while on another part of the section a new transmission line was established in a new route.

District heating transmission lines were replaced from DN200 pipes to DN300 pipes.

In addition, traffic flow was included as part of the project as well as re-establishment of land and road areas including asphalt and other pavements. Several transverse wires had to be handled on an ongoing basis, which placed great demands on the excavation work and handling of the existing wires.

The work was carried out in urban and rural areas, and therefore continuously coordinated with affected landowners.

Key figures

● 7,800 m cable work
● 3,800 m establishment of route
● 3,800 m restoration of various areas
● 3,800 m opening of areas for route
● 685 pcs. various welding work
● 700 pcs. joint installation

Back to references