Trail, Lågegyde

Bygherre: Hørsholm Municipality
Entrepriseform: Main Contract
Entreprisesum: kr. 5,2 mio.
Anlægsperiode: 2011
Rådgiver: Dines Jørgensen & Co. A/S

Info

Oversigt

Establishment of a 1.5 km long path heading both directions, with associated wire and well work at the street “Lågegyden” in Kokkedal.

Hovedmængder
  • 3.500 m² break up work
  • 3.400 m³ Top soil work
  • 4.000 m³ natural soil work
  • 4.500 m² grass seeding
  • 1.600 m drains
  • 8.400 m² bottom protection work
  • 8.100 m² base course gravel work
  • 8.500 m² asphalt work
  • 1.200 m curb