Nivå Station

Client: Spitzke
Type of Contract: Main contract
Contract sum: DDK 13,6 mio.
Construction period: 2017
Engineer: Rambøll A/S

Info

Overview

The project included a track renewal of 1.4 km railway. Rough ground plan, ballast and sub ballast were replaced.

In addition, Barslund performed drainage work along Nivå lane route. Lining was also performed under the rails for drawcords for Banedanmark signal cables. In addition, cable wires were re-established in the wiring line as well as wire and cable fuses.

Key figures

● 4.700 m wire work
● 90 pcs. wells
● 3.900 m cable work
● 5.000 m³ handling of ballast chippings, soil and gravel
● 1.400 m³ toe of ballast, SGII
● 2.700 m³ bottom chipping
● 2.600 m banquette

Back to references