TP10, Copenhagen-Ringsted

Client: Net Denmark
Type of Contract: Design and Built Contract
Contract sum: kr. 363.0 million.
Construction period: 2013-2016
Engineer: EKJ

Info

Overview

BaneDanmark wanted the construction of a new railway track from Copenhagen to Ringsted via Køge. The project “TP10 Bridges and Soil” extended from south of Avedoere Havnevej and ended south of Brøndbyvester Boulevard. It contained a total of 12 structures, including 7 overpasses, three underpasses, two wildlife passages, and four retaining walls. It was carried out as a design and build contract with 3D modeling in the design and execution. The engineering Logistics were extremely complicated since there had to be moved large amounts of soil, also across traffic.

Key figures
  • 190,000 m3 of topsoil work
  • 570,000 m³ excavation work
  • 13,000 m drainage work
  • 58,000 m³ bottom protection work
  • 82,500 m³ base gravel work
  • 5,000 m³ lime stabilization
  • 19,500 m³ concrete works
  • 20,300 tons of asphalting
  • 7 pcs. bridges and underpasses