Thisted Recycling Center

Client: Thisted
Type of Contract: Main contract
Contract sum: kr. 4.2 million.
Construction period: 2013
Engineer: COWI A / S

Info

Overview

Thisted Municipality wanted to expand Thisted Recycling Center with a new area for the reception of garden waste and new area for composting of garden waste. The extension was done with paving stones in extension of the existing Thisted Recycling.

Key figures
  • 2,000 sq demolition
  • 4,500 m³ topsoil work
  • 4,000 m³ excavation work
  • 600 m conduit work
  • 45 pcs. wells
  • 5,300 m³ bottom protection work
  • 12,500 m² base gravel work
  • 12,500 m² tile work
  • 630 m curbs
  • 430 m fence

Back to Supply