Soil work, Slagelse hospital

Client: Region Zealand
Type of Contract: Trade contracts
Contract sum: kr. 4.0 million.
Construction period: 2012
Engineer: Viggo Madsen A / S

Info

Barslund constructed the preparatory ground work for the new psychiatric hospital GAPS in Slagelse. The work contained excavation and replacement of soil. There is carried out an extensive lime stabilization of the recessed ground and planum.

Back to references