Site Development, Solrødgård, Hillerød

Client: Hillerød Forsyning
Type of Contract: Main contract
Contract price: DKK 29.4 mio
Construction period: 2015-2016
Engineer: Gotlieb Paludan

Info

Overview

Establishment of site development Solrød Farm for Hillerød Supply. The site development is located south of Hillerød at Roskildevej / Lyngevej.

The project includes the establishment of wetland signalised junction, roundabout, bridges, path connections, connection to the Climate and Environment Center, recycling and treatment plants. Conversion of existing bike path.

In addition to be performed associated sewerage and drainage work, various cable works and planting. Digging of ponds and streams.

Key figures

● 90,000 m³ subsoil work
● 135,000 m³ of topsoil work
● 8,600 m³ subbase works
● 140,000 m² seeding of grass
● 40,000 m² asphalt work
● 750m rainwater pipes, size 160-500
● 21,500 pcs. afforestation
● 3,200 m drain, size 80 / 92
● 8500 m cable plant
● 1,000 m water pipes, size 160 PE
● 5 pcs. trails and bridges