Sewer rehabilitation, St. Heddinge

Client: Stevns Supply A / S
Type of Contract: Main contract
Contract sum: kr. 14.0 million.
Construction period: 2012
Engineer: Nielsen and Risager A / S

Info

Overview

The work included the construction of a new stormwater pool and the establishment of a storm water drain.
The other renovation included wastewaterpipes and sewage pipes.
The work was performed while the sewer system was operating.

Key figures
  • 2,500 m³ stormwater
  • 1,200 m rainwater pipes
  • 650 m common wiring
  • 300 m sewage pipes
  • 40 pcs. wells

Back to Supply