Rødovre Athletics Facility

Client: Rødovre Municipality
Type of Contract: Main contract
Contract sum: kr. 6.1 million.
Construction period: 2014
Engineer: Jens Wessberg

Info

Overview

The facility includes the clearing of the existing 400m runningscourse, and construction of the following:
– 6-running tracks with artificial turf.
– 7 straight race tracks with artificial turf.
– A course located inside with a artificial turf inlet and outlet path. Lighting was also included in the contract.
Other existing athletic disciplines, the soccer field inside, and the round and straight running track was preserved.

Key figures
  • 1,500 m³ clearing of slag
  • 5,500 m³ soil work
  • 1,500 m drains
  • 400 meters drain line
  • 900 m curbs
  • 1,300 m³ bottom protection work
  • 1,000 m³ base gravel work
  • 3,500 m² asphalting
  • 3,500 m² artificial turf
  • 1 pc. lighting contract

Back to references