Rest space, Kongsted

Client: The Danish Road Directorate
Type of Contract: Main contract
Contract sum: kr. 14,0 mio.
Construction period: 2013-2014
Engineer: Grontmij A/S

Info

Overview

The contract, H20.06.20, included the establishment of a new rest area by “Kongsted” along side the westbound high way in Ringsted municipality. The contract included, in main points: soil, base course, asphalt, pavement- and signposting for the establishment of the resting area.

Key figures
  • 22.000 m³ top soil works
  • 10.000 m³ sub soil work
  • 27.000 m drainage work
  • 500 m water pipes
  • 7.700 m³ Bottom protection
  • 4.300 m³ Base course work
  • 3.500 m³ asphalt work

Back to references