Reconstruction on the Alssund Bridge

Client: The Danish Road Directorate
Type of Contract: Main contract
Contract sum: kr. 5,3 mio.
Construction period: 2014
Engineer: The Danish Road Directorate

Info

Overview

The contract called “H316.03.20 Rebuilding of Alssundbroen” includes approximately 500 m side extension of the freeway between Alssundbroen and connection to Vestermark, conversion of approximately 300 m access ramp, approximately 1300 m concrete crash barriers on Alssundbroen and adjustment of markings on the new road.

Key figures
  • 4,300 m³ top soil and earthworks
  • 1,500 m³ friction fill
  • 2,700 m³ sub base works
  • 700 m³ gravel works
  • 950 tons of asphalt work
  • 1280 m concrete barriers
  • 1,100 m drainage work
  • 270 m crash barriers