Path along Fabriksparken

Client: Albertslund Municipality
Type of Contract: Main Contract
Contract sum: kr. 3,0 mio.
Construction period: 2011
Engineer: COWI A/S

Info

Overview

The project was conducted for Albertslund, in order to improve the traffic conditions to and from “Fabriksparken”, particularly regarding accessibility and safety for cyclists and the bus flow. The project included the stretch between theTrail “Poppelstien” in the west to approximately 100 m east of “Nordre Ringvej”.

Key figures
  • 190 m³ Top soil work
  • 2.800 m³ natural soil work
  • 1.800 m pipe work
  • 1.300 m³ bottom protection work
  • 700 m³ base course gravel work
  • 4.500 m² asphalt work
  • 900 m curb