Odense Data Center

Client: MT Højgaard A/S
Type of Contract: Main contract
Contract sum: DDK 162,6 mio.
Construction period: 2017-2018
Engineer: COWI A/S

Info

Overview

In Tietgenbyen, a little out side of Odense, the 55,000 m² Odense Data Center is taking shape. Since April 2017, Barslund has put around 14 km of water and drainage pipes and 46 km of pipes for power and telecommunications in the ground. In addition, Barslund is also providing new district heating pipes in the ground as well as temporary and permanent roads.

Key figures
  • 180.000 m³ installation of sandfill under building
  • 7.500 m³ foundation excavation
  • 20.000 m³ working platform (Norwegian granite rocks)
  • 7.400 m storm water pipes Ø200-315 PP
  • 3.250 m storm water pipes Ø400-1000 Concrete
  • 12.500 m drainage tube
  • 200 pcs concrete wells Ø1000-1250
  • 475 pcs plastic wells Ø315-600
  • 18 pcs pump wells
  • 850 m line drain
  • 28.000 m² road structure, BG, SG & GAB
  • 135.000 m² construction site roads and depots, BG, SG & GAB
  • 22.000 m excavation for cable blocks
  • 550 pcs excavation for cable wells
  • 16.250 m water pipes Ø63-315
  • 3.000 m district heating pipeline DN500-800