Novo, Warehouse, Hillerød

Client: Novo Nordisk
Type of Contract: Trade-by-trade contract
Contract price: DDK 12.7 mio
Construction period: 2015-2017
Engineer: Alectia og Dissing+Weitling

Info

Overview

The project include earthworks for the upcoming warehouse with a area of about 14.000 m² with associated product courtyard and parking.
The soil-contract include the following work:
· Excavations
· Backfilling
· Dewatering

Key figures

● 20,500 m² clearing of vegetation
● 74,300 m³ excavat soil clay and sand
● 60,000 m² leveling of excavation
● 27,000 m² geo reinforcing net
● 13,000 m³ sand and gravel fill
● 4,900 m³ subsoil work
● 4,900 m³ gravel work
● 60,000 m² area leveling of built surfaces
● 34,000 m³ terrain regulation
● 6,000 m³ topsoil
● 50 pcs. trees 1,5-2 m high
● 150 pcs. trees 3-4 m high
● 20,000 m² small plants
● 1 pcs. purification of lake
● 400 m drains
● 16 pcs. sump incl. submersible pump