Noise barrier GAPS Slagelse

Client: Region Sjælland
Type of Contract: Main contract
Contract price: kr. 6,2 mio.
Construction period: 2015
Engineer: Vejdirektoratet

Info

Overview

The contract “GAPS noise barrier” includes the establishment of noise barrier along a ca. 600-meter stretch of the M20, between exits 38 Slagelse Ø and 39 Slagelse S in the southward direction of the highway. The screen is 4 meters above the road plan and made of aluminum cassettes. It brought on a slope in the immediate extension of the lay Antvorskov North.

Key figures
  • 1.000 m³ top soil and subsoil work
  • 600 m drainage
  • 500 m crash barriers
  • 620 m drilled piles
  • 840 pcs. noise barrier cassettes