The municipality of Helsingør is establishing a new power plant, where Barslund has been present at the construction site from day one.

Barslund has performed three building pits: for silos, the filing center and the new sorting system.

In addition, Barslund have carried out drainage, access roads, landscaped parking areas, sewerage and rainwater basins. Two lakes are also beeing constructed.

Key figures

● 17.000 m³ soil work
● 55 pcs. wells
● 800 m wire work
● 7.500 m³ subbase work
● 10.000 m² base gravel work
● 25.000 m² asphalt work
● 400 m² concrete coating
● 1,500 m² breakdown asphalt/concrete
● 1,500 tonnes of masonry worker
● 11,000 tonnes of class 1 soil
● 1,500 tonnes class 2-3 soil
● 600 tonnes of class 4 soil
● 1.100 m PP wire Ø110-315
● 1 pc. dewatering plant
● 3,000 m² pilling wall mounting
● 10,000 m³ built-in noise