Navigation channel, Rungsted Harbour

Client: Hørsholm
Type of Contract: Main contract
Contract sum: kr. 2.0 million.
Construction period: 2005-2013
Engineer: Hørsholm

Info

Overview

Barslund has over the past 15 years dredged navigation channel, for Hørholm Municipality, in the Sound out of Rungsted Rowing Club. The excavated sand from the trenches is obvious in place south of Rungsted Harbour for dewatering. After it has been capped at Rungsted Beach south of Rungsted Harbour.

Key figures
  • 3,000 m³ excavation of sand