Hvidovre Hospital

Client: Region Hovedstaden
Type of Contract: Main contract
Contract sum: 37.6 mio. DKK
Construction period: 2017-2018
Engineer: Schmidt

Info

Overview

The contract deals with the development for the expansion of Hvidovre Hospital. The work includes excavation for a construction pit, as well as removal and handling of class 0-4 soil. In addition, the work includes i.a. bottom protection work, sewerage and establishment of supply lines.

Other than that; excavation for foundations, backfilling around the building, paving in the car park basement, drainage work and the establishment, and later also relocation, of the construction site road.

Key figures

● 1,800 m break-up of various supply lines
● 1,400 m of pipeline work
● 640 m heating pipes
● 2,350 m drain
● 640 m empty pipe for cables
● 100,000 m³ earthworks
● 100 pcs. wells
● 5,000 tonnes of contaminated soil
● 10,000 bottom protection works
● 30,000 m³ sandfill installation
● 1,950 m³ excavation and sorting of soil
● 3,000 m² of stone paving
● 170 pcs. wells
● 6 pcs. pumping stations
● 4,000 m drain pipe
● 7,500 m² establishment and removal of construction site road and facade