Højelt Recycling

Client: Gribskov Kommune
Type of Contract: Main contract
Contract price: kr. 7,7 mio.
Construction period: 2014
Engineer: COWI A/S

Info

Overview

The contract include an update and a new, sustainable Højelt Recycling. The task included the demolition of existing buildings and coatings. Establishment of new coatings, new drains and new concrete structures – including retaining walls.

Key figures
  • 220 ton removal
  • 4,200 m³ top soil and sub soil
  • 350 m cable work
  • 2,000 m³ sub base
  • 1,600 m³ gravel work
  • 300 m curbs
  • 3,600 m² Coloc-stone
  • 1,000 m² asphalt
  • 189 m concrete structures