Hillerød Power Plant

Client: Polytecknik
Type of Contract: Main contract
Contract price: Kr. 9,9 mio.
Construction period: 2015
Engineer: Rambøll A/S

Info

Overview

In connection with the construction of a new wood-fired cogeneration plant for Hillerod Supply’s construction pit workers offered as trade contracts.

The work includes the establishment of retaining walls, dewatering, excavation pollution, sewage works. In addition, the establishment of site roads and seating positions for future contractors.

Key figures

● 1,500 m² clearing asphalt / concrete
● 1,500 ton topsoil work
● 10,500 ton class 1 land
● 1,500 ton class 2-3 soils
● 600 ton class 4 soil
● 1100 m PP cord size 110-315
● 1 pcs. dewatering systems
● 3,000 m² retaining walls
● 10,000 m³ installation of noise barrier
● 25 pcs. well, size 315-425
● 2,500 m³ subbase work
● 650 m³ gravel work

Back to references