Grass fields Brondby

Client: Brøndby
Type of Contract: Main contract
Contract sum: kr. 3.3 million.
Construction period: 2010-2011
Engineer: Dines Jørgensen & Co. A / S

Info

Overview

The contract included the establishment of an area fitting ​​3 new grass soccer fields, located in the “Green Wedge” in Brøndby. The contract contained soilwork, growth layer-, drainage, wire and well work.

Key figures
  • 33,200 m³ excavation work
  • 41,500 m² cambium
  • 6,500 m drains

Back to Sports or Landscape