Gl. Badevej, Rodby

Client: Fehmarn Belt A / S
Type of Contract: Main contract
Contract sum: kr. 11.9 million.
Construction period: 2013-2014
Engineer: Ramboll A / S

Info

Overview

In connection with the establishment of the fixed link to Germany the parliament has passed a number of advanced investments. One of these is the expansion and extension of the existing road, Gl. Badevej Rødby. The work is performed in a Natura2000 area covered by the Nature Conservation Act § 3 and where animals covered by the Habitats Directive Annex is living. Therefore there has been launched special measures to ensure these circumstances and to protect the lake by the road, from suffering unnecessary harm.

Key figures
  • 3,500 m³ topsoil work
  • 5,000 m³ excavation work
  • 3,000 m drainage
  • 1100 m concrete pipes Ø70-Ø90
  • 9,200 m³ bottom protection work
  • 5,100 m³ base gravel work
  • 8,700 m² asphalting

Back to references