Client: Gentofte
Type of Contract: Design and Built Contract
Contract sum: kr. 20.0 million.
Construction period: 2012-2013
Engineer: Dines Jørgensen & Co. A / S

Info

Overview

The overall contract comprised the extension of Gentofte sports park, including 4 new clubhouses, an extension of the existing artificial turf soccer field, the establishment of a new artificial field for fieldhockey and petanque.
Additionally it included work on a brand new power project which included management of all fields and clubhouses, and the establishment of a new comprehensive LAR(Local area rainwater) construction which percolates the rainwater. The Club houses were equipped with toilet, kitchen / dining area, utility room, as well as a grass roof, skylights and awnings.

Key figures
  • 50,000 m³ excavation work
  • 450 m ditches LAR
  • 14,000 m² of artificial turf
  • 3,000 m³ bottom protection work
  • 2,000 m³ base gravel work
  • 2,500 m drainage pipes
  • 2,500 m cable trace
  • 2,000 sq pavements
  • 800 m fences
  • 4 pcs. clubhouses of 70 m²