Genbrugsplads, Køge

Client: KARA / NOVEREN I / S
Type of Contract: Main contract
Contract sum: kr. 8.0 million.
Construction period: 2010-2011
Engineer: COWI A / S

Info

Overview

The contract included a rebuilding of Denmarks largest recycling center in Køge, where about 10,000 m2 paved areas were built with concrete pavers and associated drainage system. In addition, there was established 350 m of foundations for retaining walls with subsequent installation of retaining wall elements. Furthermore, there was established more than 1,000 m storm water pipes and intercepting drains, and various lighting, planting-, wire and well work. Bottom protection with slag.

Key figures
  • 5,000 m³ excavation work
  • 1,200 m drainage work
  • 5,500 m³ slag
  • 2,400 m³ base gravel work
  • 400 m concrete curbs
  • 10,300 m² paving
  • 350 m støttemurselementer