Flintholm Busproject

Client: City of Copenhagen
Type of Contract: Main contract
Contract sum: kr. 34.0 million.
Construction period: 2013-2014
Engineer: Viatrafik A / S

Info

Overview

Copenhagen wants to improve the bus passability on roads around Flintholm Station. Meanwhile, the bus terminal in Flintholm Station will be restructured so it can operate the increasing number of buses in the future. On one of the constructions locations, the contract has both Copenhagen and Frederiksberg as builders. The rebuilding of the road network consists of extensive intersection and signal conversions.

Key figures
  • 7,500 m² demolition
  • 8,800 m³ excavation work
  • 3,500 m curbs
  • 1,500 m³ bottom protection work
  • 2,000 m³ base gravel work
  • 500 m³ root friendly base course
  • 1 pc. signaling and lighting
  • 3,500 m² asphalting
  • 2,100 m² coatings
  • 1 pc. Sheltered construction work