Entreprise 6063.200 og 201 – Expansion of highway between Vejle – Skærup

Client: The Danish Road Directorate
Type of Contract: Main contract
Contract sum: kr. 260.0 million.
Construction period: 2011-2013
Engineer: Road Directorate (roads)

Info

Overview

These contracts dealt with the widening of High Way 60 on the strech between the intersection by Skærup and Vejlefjordbroen until Vejle Nord. The contract included the establishment of traffic flow during the constructional phase. Expansion of the existing high way, “M60 Østjyske Highway”, from 4 to 6 lanes. An extension from 4 to 8 lanes was carried out on a 1.6 km long strech. In addition, there was established a new bridge, rest area, 10 storm water pools and a curtain of sheet piling at Skærup Resting place.

Key figures
  • 197,800 m3 of topsoil work
  • 333,000 m³ excavation work
  • 52,000 m drainage work
  • 138,500 m³ bottom protection work
  • 62,000 m³ base gravel work
  • 25,500 m³ cement stabilization
  • 36,200 m³ lime stabilization
  • 8,000 ton demolition
  • 136,500 tons of asphalting
  • 25,700 m crash barrier

Back to references