Client: The Danish Road Directorate
Type of Contract: Main contract
Contract sum: kr. 57.0 million.
Construction period: 2010-2012
Engineer: COWI A / S

Info

Overview

The contract included the construction of a new highway from high way 3 in the east to “Nordre Ringvej” in the west. The job included soil, coating and drainage work incl. the establishment of a stormwater pool, portals and lighting etc. big parts of the soil that had to be moved doing the excavation of the highway, had to be moved to the north side of the M12, where there over a distance of approximately 2 km was established noise barriers. The remaining amount of soil was placed in noise barriers surrounding the highway system.

Key figures
  • 80,000 m³ topsoil work
  • 350,000 m³ excavation work
  • 9,700 m drainage work
  • 65,000 m³ bottom protection and base gravel work
  • 3,000 m cable ducts
  • 3,000 tons of asphalting
  • 150 pcs. foundations for lighting
  • 8 pcs. foundations for portals