E1120.21, Tuse North Herrestrup

Client: The Danish Road Directorate
Type of Contract: Trade contracts
Contract sum: kr. 18.0 million.
Construction period: 2011-2012
Engineer: The Danish Road Directorate

Info

Overview

Lot 1120.21 is a part of the new road link between Holbæk-Vig.
Barslund performed part of the contract as a subcontractor for KL Kristensen. Barslunds part of the contract covered the soil and drainage work on around 2.5 km of the stretch.

Key figures
  • 232,000 m3 topsoil work
  • 47,000 m drainage work
  • 477,000 m³ excavation work
  • 30,000 m³ slag
  • 152,000 m³ bottom protection work
  • 39,000 m³ base gravel work
  • 19,000 m² breaking up asphalt