Drainage, Sæby

Client: Camps Supply
Type of Contract: Main contract
Contract sum: kr. 14.9 million.
Construction period: 2011-2012
Engineer: COWI A / S

Info

Overview

Renovation by excavation and replacement of sewage pipes in the northern part of the old Sæby.

Establishment of a new stormwater pool in the southern part of Sæby. Establishment of a new rain water drain from the northern part of Sæby to the storm water pool and a new sewage pipe from the north of Sæby over the fields to Sæby Purification plant

The Sewer rehabilitation was conducted in a residential area.

Key figures
  • 650 m concrete pipes
  • 4,700 m plastic wires
  • 22 pcs. concrete wells
  • 5,000 m³ stormwater pools

Back to references