Client: Nordic Proberty
Type of Contract: Design and Built Contract
Contract sum: kr. 15.3 million.
Construction period: 2014-2015
Engineer: Orbicon

Info

Overview

In connection with the development, conversion and extension of a new shopping center on the old DISA site in Herlev, the surrounding roads and means of access, had to be rebuilt and restructured, due to a dramatically increase in traffic. The work was done as a design and build contract and in close cooperation with the plan developer NPV, Herlev Municipality and the Danish Road Directorate. The work was done in an area with a lot of traffic and many stakeholders.

Key figures
  • 1,500 m² demolition
  • 2,000 m³ top soil and excavation work
  • 1,400 m³ bottom protection work
  • 850 m³ base gravel work
  • 2,500 m² asphalting
  • 1,900 m curbs
  • 300 m² pavement
  • 2 pcs. lighting control systems
  • 20,000 m² asphalting-topping