Development services of filament lamps, Herlev

Client: KAB, DAB, NCC and 38
Type of Contract: Main contract
Contract sum: kr. 18.5 million.
Construction period: 2011-2013
Engineer: COWI A / S

Info

This contract was divided into two stages. The first stage included the total land development of the former factory site, “Glødelampen”, in Herlev. The site was prepared, since 300 new public housing (other contract) was to be built . The second stage included the construction of all outdoor areas, including paving and planting work. The work was done both for builders and general contractors at the various subdivisions.

Back to references