Overview

This contract was divided into two stages. The first stage included the total land development of the former factory site, “Glødelampen”, in Herlev. The site was prepared, since 300 new public housing (other contract) was to be built . The second stage included the construction of all outdoor areas, including paving and planting work. The work was done both for builders and general contractors at the various subdivisions.

Key figures
  • 4,600 m³ topsoil work
  • 15,000 m³ excavation work
  • 500 m sewage pipes
  • 900 meters rainwater pipes
  • 700 m water pipes
  • 7,500 m³ bottom protection work
  • 2,100 m³ base gravel work
  • 3,400 m³ asphalting
  • 8,500 m² coating