Cross intersection in Kolding, Ndr. Ringvej-Skovvangen

Client: Kolding Kommune
Type of Contract: Main contract
Contract sum: DDK 14,8 mio.
Construction period: 2017
Engineer: Sweco

Info

Overview

Barslund has reconstructed the intersection Ndr. Ringvej-Skovvangen in Kolding. The purpose was to increase the accessibility for road users.

Barslund has established a right-hand lane in the western direction, extended the left-hand lane to the east and extended Skovvangen with a right-hand lane.

In addition, bicycle paths have been established along Skovvangen incl. tunnel underpass at Ndr. Ringvej and piling along ndr. Ringvejs nordside.

The tunnel was carried out over a weekend. One of Kolding’s biggest cross intersections was closed to excavate the new tunnel for bikers and pedestrians. That same weekend, the old tunnel was broken up and removed. The road was opened again Monday morning.

Key figures

● 8.700 m² asphalt work
● 1.400 m² pavement
● 1.350 m curbs
● 11.200 m³ soil work
● 1.000 m pipe work
● 7.000 m² base gravel work
● 2.200 m plug
● 2.200 m³ subbase work
● 35 pcs. wells
● 1 pcs. path tunnel