Carlsberg City, Infrastructure

Client: Carlsberg Byen Ejendomme P/S
Type of Contract: Main contract
Contract sum: kr. 14,4 mio.
Construction period: 2014-2015
Engineer: Arpe & Holm

Info

This project is part of the overall infrastructure in the new district, Carlsberg City, and deals with the creation of “J.C. Jacob Gade” which is the first of a total of eight roads (road segments) outside the building sections. Almost 500 meters of new road incl. supply lines have to be built to supply the building sections.

Back to references