This project is part of the overall infrastructure in the new district, Carlsberg City, and deals with the creation of “J.C. Jacob Gade” which is the first of a total of eight roads (road segments) outside the building sections. Almost 500 meters of new road incl. supply lines have to be built to supply the building sections.

Key figures
  • 3.500 m² asphalt removal
  • 3.550 m³ top soil- and sub soil work
  • 600 m drainage work ø250/ø400
  • 530 m roaddrain
  • 15 stk. wells Ø1000/1250
  • 35 stk. road wells
  • 350 m water pipes ø315-ø110
  • 1.000 m digging for district heating/gas/district cooling
  • 1.600 m digging for Electricity/IT/road lighting
  • 1.400 m³ sub base
  • 1.200 m³ base course work
  • 3.000 m² asphalt work
  • 880 m granite curb