Development for new hospital wing
The contract deals with building development in connection with the expansion of Bispebjerg Hospital’s new psychiatric ward – New Psychiatry Bispebjerg and includes clearing, cancellation of existing pipes, excavation of construction pits, establishment of surface drainage, including two large pump wells, controlled sub-drilling and groundwater lowering.

The work includes the establishment of two Ø3000 pump wells at a depth of 6-9 meters, as well as the excavation of existing Ø400 pipes at a depth of 4 meters.

In addition, access roads for emergency vehicles from Tuborgvej and into the hospital must be maintained throughout the contract.

Key figures
● 58,000 m³ raw earth work
● 25,000 m³ bottom protection work
● 3,700 m³ stable gravel work
● 3,400 m² asphalt work
● 100 m copenhagen punch (sheet piles)
● 2 pcs. Ø3000 pump wells
● 100 m Ø250 controlled drilling
● 1,300 m cable work
● 8,000 m² road