Athletics Stadium, Lyngby

Client: Lyngbytaarbæk Municipality
Type of Contract: Main contract
Contract sum: kr. 8.1 million.
Construction period: 2013
Engineer: Sloth Møller A / S

Info

Overview

The construction case involved the establishment of a new athletics stadium with 6 running tracks with artificial turf, grass field, facilities for javelin, hammer and discus, shot put, length, height and pole vault, laying of drainage pipes, establishment of lighting systems, fences, landscaped pathwalks and various smaller coating areas related to adjustments to the adjacent terrain.

Key figures
  • 8,100 m³ topsoil work
  • 7,100 m³ excavation work
  • 3,500 m drains
  • 5,700 m² of artificial turf
  • 7,700 m² grass seeding

Back to Sports or Landscape