Artificial Turf Field, Dragør

Client: Sportsturf
Type of Contract: Trade contracts
Contract sum: kr. 2.4 million.
Construction period: 2013
Engineer: Bascon

Info

Overview

Execution of soil, drainage and coating work in connection with the establishment of the artificial turf field in Dragør. The work was performed as a subcontracter for Sportsturf

Key figures
  • 7,000 m³ topsoil work
  • 4,700 m³ bottom protection work
  • 1,700 m³ base gravel work
  • 12,500 m drains
  • 700 m² coatings

Back to Sports or Landscape