Artificial Turf Field, Brondby

Client: Brøndby
Type of Contract: Main contract
Contract sum: kr. 5.5 million.
Construction period: 2010
Engineer: Dines Jørgensen & Co. A / S

Info

Overview

The work included construction of drainage system and the foundation for a new 16,000 m2 artificial turf field. The contract also included a completed fence around the field and the foundation work for the lighting of the fields.
The work was done at Brøndby stadium construction for Brøndby Municipality.

Key figures
  • 35,000 m³ top soil and excavation work
  • 10,200 m³ of sand and compost incorporation
  • 9,600 m drains