Artificial pitch Nakskov

Client: Lolland Municipality
Type of Contract: Trade contracts
Contract sum: kr. 2.2 million.
Construction period: 2009
Engineer: Claus Madsen

Info

Overview

The contract included the establishment of a new 3rd generation artificial turf field on the stadium of Lolland Municipality. The work was done as a sub-contracts and included drainage, base layer- and paving work.

Key figures
  • 5,500 m³ excavation work
  • 3,200 m drains
  • 2,400 m³ bottom protection work
  • 1,600 m³ base gravel work
  • 8,000 m² afretningsgrusarbejder
  • 500 m² paving
  • 400 m curbs

Back to Sports or Landscape