Artificial pitch Herfølge

Client: Køge Municipality
Type of Contract: Main contract
Contract sum: kr. 3.5 million.
Construction period: 2012
Engineer: Jens Wessberg A / S

Info

Overview

Th establishment of artificial turf on an existing turf field. The work was done by an excavation of up to 60 cm, thereafter a new base layer was built and finished off with a layerr of artificial turf. The contract included fully equipment i.e. fences, goals, lighting system and tiling around the field.

Key figures
  • 5,000 m³ excavation work
  • 1,500 m drains
  • 8,500 m² gravel surface
  • 8,000 m² of artificial turf