Client: City and port I / S
Type of Contract: Design and Built Contract
Contract sum: kr. 130.0 million.
Construction period: 2013-2015
Engineer: MOE A / S
Establishment of a major land development in the” Århusgade neighborhood” — Copenhagen’s new harbour district, with space for 3,000 new residents and 6,500 new jobs. There will be established supply lines, canals, 2 new bridges as well as roads and squares – for the servicing of existing buildings that are maintained or rebuilt, and for the new construction areas.
In addition to the main quantities 300 m sheet piling and 300 m clampswere established and 600 m3 in situ concrete was performed. In addition, 60 tons of polluted Class 2 and 3 soil were handled.
- 2,200 m³ topsoil work
- 25,700 m³ excavation work
- 4,900 m drainage work
- 14,900 m³ bottom protection work
- 46,600 m³ base gravel work
- 5,000 meters of district heating pipe
- 5,000 m conduit work
- 15,700 m³ asphalting
- 35,200 m² surface works
- 60 tons of contaminated soil class 2-3