Client: ARKEN Museum of Modern Art
Type of Contract: Turnkey contract
Contract sum: kr. 20.4 mio.
Construction period: 2014-2015
Engineer: Atkins

Info

Overview

The project involves a landscape and terrain-related restructuring with the establishment of a lagoon, surrounding the museum, which as a result will be located on an island.
70,000 m3 will be excavated for the establishment of the lagoon.
The surrounding terrain is modeled, road and parking conditions will be rearranged and there will be established three road bridges and two bridges for pedestrians.
The forecourt is embellished with coloured asphalt. Finally the dune is extended and the vegetation is changed.

Key figures
  • 4,000 m² demolition
  • 75,000 m³ topsoil and excavation work
  • 350 m conduit conversion
  • 1,200 m² of sheet piles
  • 12,000 m³ bottom protection work
  • 5,000 m³ base gravel work
  • 18,000 m² clayed road gravel
  • 5 pcs. bridges